The Obstacle: Implementing sufficient capacity to satisfy initial and long-term space, power, and cooling administration requirements is a challenge. More specifically, a number of structures will require significantly higher levels of cooling and electrical power in the future than they did when they were constructed.
The arrangement… The solution to the problem of cost and premature aging is for the plan group to clearly distinguish between initial requirements and a limit that is built into the framework to meet future requirements.