The arrangement… The solution to the problem of cost and premature aging is for the plan group to clearly distinguish between initial requirements and a limit that is built into the framework to meet future requirements.

It has been stated that the planning team cannot attempt to design a structure that meets all requirements; rather, it must design a structure that can be modified to meet all requirements. The design and measurement of spaces, services, and structures reflect this adaptability. The plan group is incomplete without the CLA Consultant.

Loading