The arrangement… The solution to the problem of cost and premature aging is for the plan group to clearly distinguish between initial requirements and a limit that is built into the framework to meet future requirements.
It has been stated that the planning team cannot attempt to design a structure that meets all requirements; rather, it must design a structure that can be modified to meet all requirements. The design and measurement of spaces, services, and structures reflect this adaptability. The plan group is incomplete without the CLA Consultant.